Project 1


The objective of this project is to design a perfect truss bridge which has both aesthetic value and minimal usage of construction material. The main material of the bridge is fettucine, with the allowance of the application of glue for connection and layering purposes. 

Click to view Final Report.

Test 1

Test 2

Test 3

Final Test

Project 2


For project 2, we were to design an extension for an existing bungalow, and to determine the structural plan for the extension. After that, individually we were required to calculate the shear force and bending moment acting on the respective 6 beams and 4 columns.